First half of concrete entryway poured.
Completed concrete entryway cured and sawcut.
Completed work.
Before and After
A heavily damaged catch basin prior to rebuilding.
Excavation of debris.
Solid concrete "footer" installed
Solid concrete walls and collar installed.
Concrete that is curing or drying.
Concrete that has cured or hardened.
Concrete curb being formed.
Completed example of concrete curb.
Completed example of cut out.
Blacktop being removed with Wirtgen milling machine.
Completed project.
Parking lot prior to excavation.
Parking lot during excavation.
Limestone added and re-graded.
Limestone being compacted with stone roller.
Base blacktop layer applied.
Paving crew applying surface layer
Completed and striped lot (chalk marks wash away).
Pathway prior to excavation.
Blacktop removed from pathway.
Completed pathway.
Various examples of logos and layouts.
Completed example of crack fill.
Completed example of sealcoating.
Parking lot underground water prior to installation of underdrains.
Trenches cut and underdrain pipe being installed.
Completed underdrains - 2 years later.
Distributor truck spraying liquid AC to bond Petromat to the surface.
Liquid AC applied to existing blacktop.
Petromat fabric being applied.
Layer of new blacktop applied over Petromat
(614) 272-0256 (614) 272-7144 1850 McKinley Avenue • Columbus, Ohio 43222 office@depuypaving.com